deployment

Transport, installation and technical coordination through to operational readiness.

Send a requirement
Concept image: a mobile crane lifting a modular unit onto foundations while site staff guide the load at dusk.
Concept image

RIE coordinates the path from equipment to an operational site. Transport, placement, technical installation and commissioning are brought together with suppliers and specialist partners in one aligned sequence.

DEPLOYMENT

Scope

Possible components for your site. Selection and design depend on demand, site conditions and confirmed availability.

  1. 01Transport
  2. 02Heavy logistics
  3. 03Crane operations
  4. 04Installation
  5. 05Electrical works
  6. 06Plumbing
  7. 07Commissioning
  8. 08Maintenance
  9. 09Demobilisation

Typical requirements

Examples of what this area is deployed for – as possible applications, not as completed references.

  • 01

    Coordination of several suppliers.

  • 02

    Set-up under tight time and site constraints.

  • 03

    Aligned commissioning and later demobilisation.

Integrated in the overall site

Deployment connects the infrastructure components into a functioning site. Responsibilities, interfaces and handover are defined in the project concept.

One requirement. One delivery schedule. One point of responsibility.

RIE 48

From requirement to feasibility in 48 hours.